GLaDOS Cluster Status

From RCSWiki
Revision as of 17:23, 26 June 2023 by Cemagata (talk | contribs) (add motd for glados to notify users of upcoming move to rdc.)
Jump to navigation Jump to search

GLaDOS status: Cluster operational


No upgrades planned. Please contact us if you experience system issues.

See the GLaDOS Cluster Status page for system notices.

System Messages

⚠️ January System Updates - 2023/01/01

Beginning January 30, 2023, the GLaDOS cluster will undergo operating system updates. We shall do our utmost to minimize disruption and allow ongoing jobs to be completed. New jobs may be temporarily held from scheduling.

The GLaDOS login node will reboot on the morning of January 30. Please save your work and log out if possible.

The upgrade is planned to be fully complete by February 3.

If you encounter any system issues, do not hesitate to let us know.

Thank you for your cooperation.

System Updates Completed - 2023/01/31

The upgrade has been completed. The following has been changed:
  • OS Updated to Rocky Linux 8.7
  • Slurm updated to 22.05.7
  • Apptainer replaces Singularity
  • Each job will have its own /tmp, /dev/shm, /run/user/$uid mounted

If you encounter any system issues, do not hesitate to let us know.

Thank you for your cooperation.

Apptainer (Singularity) on GLaDOS Login Node - 2023/06/23

Apptainer (Singularity) containers may experience an error when

running on the GLaDOS login node. If apptainer complains that a system administrator needs to enable user namespaces, simply run your containers inside a job.

This is a temporary measure due to security vulnerability that will be

patched soon.

GLaDOS Scheduled Temporary Shutdown for Move - 2023/06/26

GLaDOS is scheduled to be shut down temporarily to allow for the

cluster to be physically moved beginning Tuesday September 5, 2023 The cluster is expected to be down the rest of the week and back online on or before Monday the 11th.

Please send any questions or concerns to support@hpc.ucalgary.ca