MARC Cluster Status: Difference between revisions

From RCSWiki
Jump to navigation Jump to search
(Created page with "{{MARC Cluster Status}} == System Messages == {{Message of the day item | title = ⚠️ January System Updates | date = 2023/01/01 | message = Beginning January 23, 2023, the ARC cluster will undergo operating system updates. We shall do our utmost to minimize disruption and allow ongoing jobs to be completed. New jobs may be temporarily held from scheduling. The ARC login node will reboot on the morning of January 16. Please save your work and log out if possible. T...")
 
Line 6: Line 6:
| date = 2023/01/01
| date = 2023/01/01
| message =
| message =
Beginning January 23, 2023, the ARC cluster will undergo operating system updates. We shall do our utmost to minimize disruption and allow ongoing jobs to be completed. New jobs may be temporarily held from scheduling.
Beginning January 23, 2023, the MARC cluster will undergo operating system updates. We shall do our utmost to minimize disruption and allow ongoing jobs to be completed. New jobs may be temporarily held from scheduling.


The ARC login node will reboot on the morning of January 16. Please save your work and log out if possible.
The MARC login node will reboot on the morning of January 23. Please save your work and log out if possible.


The upgrade is planned to be fully complete by January 20.
The upgrade is planned to be fully complete by January 27.


If you encounter any system issues, do not hesitate to let us know.
If you encounter any system issues, do not hesitate to let us know.

Revision as of 20:48, 2 February 2023

MARC status: Cluster operational


No upgrades planned. Please contact us if you experience system issues.

See the MARC Cluster Status page for system notices.

System Messages

⚠️ January System Updates - 2023/01/01

Beginning January 23, 2023, the MARC cluster will undergo operating system updates. We shall do our utmost to minimize disruption and allow ongoing jobs to be completed. New jobs may be temporarily held from scheduling.

The MARC login node will reboot on the morning of January 23. Please save your work and log out if possible.

The upgrade is planned to be fully complete by January 27.

If you encounter any system issues, do not hesitate to let us know.

Thank you for your cooperation.

System Updates Completed - 2023/01/24

The upgrade has been completed. The following has been changed:
  • OS Updated to Rocky Linux 8.7
  • Slurm updated to 22.05.7
  • Apptainer replaces Singularity
  • Each job will have its own /tmp, /dev/shm, /run/user/$uid mounted

If you encounter any system issues, do not hesitate to let us know.

Thank you for your cooperation.